File Expiration and Scheduled Slides

Last updated

Add a slide to your layouts on a set date, and take it off on another, without editing each layout. Good for promotions, holidays and events.

What you’ll need

Steps

  1. To take a file off screens on a date: in Files, open the file’s menu and click Set Expiration. Choose the Expiration date and, if you like, a Notification email, then click Save expiration. On that date the file is taken off your layouts. Clear expiration cancels it.

    The Set Expiration window with the Expiration date highlighted and an optional Notification email
  2. To add a file to layouts, now or on a date: open the file’s menu and click Add to Layout(s). Check the layouts (use Find a layout to search); checking a folder adds the file to every layout in it. Choose Add now, or Add on a date and pick the date. Set the Duration (seconds) or leave it at the layout default (a video always plays to the end). For Add on a date you can also enter a Notification email. Click Add to layouts, or Schedule for a date. The file is added as the last slide of each layout’s main slideshow. To take a file off layouts right away, click Remove From Layout(s), check the layouts and click Remove from layouts.

    The Add to Layout(s) window with layouts to choose, and Add on a date selected with a date and duration
  3. To see what is coming up, click Files With Schedules on the Files page: it lists the files scheduled to be added and those scheduled to expire. In the file list, Add scheduled next to In use marks a file that will be added to layouts on a date, and Expires marks one with an expiration date. Point to either one to see the date.

    The Files page with the Files With Schedules button highlighted, and files showing Add scheduled and Expires next to In use

What’s next

Scheduling Playlist Changes: change whole layouts at set times.